Page 15 - Welcome to VEPO® | www.VepoCo.com
P. 15
INSTALL A. CLEAN ALL OF THE DEBRIS AND WIPE DOWN WITH ACETONE TO REMOVE OILS. SUCCESFUL INSTALLATION REQUIRES A CLEAN AND DRY SURFACE. C. FLIP PIECE FACE UP AND TAPE ONE SIDE DOWN TO SECURE LOCATION. E. APPLY DOWNWARD PRESSURE FROM THE CENTER WORKING YOUR WAY OUTWARD. REPEAT STEPS D-E ON THE OTHER SIDE. B. FIRST DRY-FIT THE PIECE TO BE INSTALLED IN IT'S LOCATION. THEN FLIP AND SCORE LINE DOWN THE CENTER ON THE BACK LINER. D. LIFT UNTAPED SIDE AND REMOVE THE LINER STARTING FROM THE SCORE LINE. F. ENSURE THE PAD IS FIRMLY BONDED AND NO AIR POCKETS REMAIN. 1.440.709.8349 • 15